Our Quality and Logistic Plan

Quality is never an Accident. It is always the result of intelligent efforts by simply doing work right. Quality forms an integral part of all the system involved in the Project. Quality is assured with doing things right with defined methodology.

Things Monitored during projects

01

Work procedure

Follow established procedures for efficient task execution.

02

Method statement

Define clear methods to achieve project goals with precision.

03

Regular Inspections

Conduct frequent inspections to ensure compliance and quality.

04

Checklist

Use checklists to systematically verify and complete tasks.

Process

1

Verification of Materials

2

Installation of Materials

3

Progress Photographs

4

Inspections/ Tests reports

Logistic Plan

Logistic Set-up

  • Identification of Vehicles entry, exits timings as per location rules.
  • Identification of dedicated Store.
  • Identification of Debris yard.
  • Identification of Fabrication area.
  • Deploying separate resources for loading, unloading and shifting of materials

Logistic plan of material delivery

  • Material will get unloaded in identified store yard.
  • Material will be shifted to required location/ level through internal transport system by trolley etc.

Labour Movement Plan

  • Controlled labor, having an approved ID card only, should enter from one gate to a dedicated area/floor.
  • Workers should enter through dedicated staircase or Service Lift.
  • Dedicated security at entry by Client.
  • Identification of Fabrication area.
  • One security will check PPEs, Frisking for banned substances.
  • Labour having proper PPE’s only will allowed to entre the working area.

Waste Management

  • Waste to be separated disposable and recyclable.
  • Shifting of waste to desire location as per identified timings.
  • Managing required documentation from Signing authority, if any.